Villa Almendra Phase I

Project Name:

VILLA ALMENDRA PHASE I

Program:

17 new single family attached homes.

Description:

To maintain the single-family residential character of the site’s immediate neighbors, the design breaks the program up into 5 different buildings of three units each and one building with two units.

Tower elements celebrate the prominence of the site in this established neighborhood just south of downtown. All units feature two car private garages and are entered either from the street or from a private paseo. Community gardens and a tot-lot create a space for the residents to congregate and raise both their children and vegetables.

Project Location:

San Jose, California

Client Name:

Neighborhood Housing Services Silicon Valley

Completion Date:

Early 2007

Construction Cost:

$5,200,000

Project Team:

Owner’s Representative: Rodney Geiman

Architect: Studio S Squared Architecture; Eugene H. Sakai, AIA, Principal, Karen Smith, Assoc. AIA, Catherine Gutierrez, Assoc. AIA

Structural Engineer: Structech MHN; Stephan Hosea, PE, Principal

Civil Engineer: WEC Engineering and Associates; Ed Wu, PE, Principal

Geotechnical Engineer: Romig and Associates; Glenn Romig, Principal

Landscape Architect: Greg Ing and Associates; Greg Ing, Principal

Contractor: Branagh, Inc.; Rick Newacheck, Vice President

M/E/P Engineer: AEC Professionals; Mozart Faizi, Principal